top of page

BAHIA SOLANO

The project consisted of the studies, design, construction and commissioning of accommodation for the dock of the Coast Guard Station, located in Bahía Solano.

 

It was developed with the modular Royal Building System (RBS).

The architectural, structural, hydrosanitary, RCI and electrical designs were made.

The construction included the installation of the electrical, hydraulic, sanitary, drinking water, and voice and data networks. A firefighting system and a hydropneumatic system were installed.

Additionally, a housing container was adapted in Cerro Mutis, whose access is limited due to the topographical difficulties of the place.

bottom of page