top of page
For dark background

JURADO

Construction of a 55-meter-high self-supporting metal tower, including foundation;

and a 15 m² shed with Royal Building System (RBS) for communications equipment.

 

Fuel storage and electrical generation system composed of 2 tanks with a capacity of 500 gallons of ACPM and 2 generators.

 

Installation of protection system against atmospheric faults and grounding.

 

Concrete stairs and enclosure for the electrical generation system.

© 2023 MFG Engineering SAS

  • Linkedin
bottom of page